Banner Ironwood

Client: Banner Healthcare
Architect: Boulder and Associates

The collaboration through preconstruction endeavors with the functional program accelerated Banner’s state credentialing and accreditation requirements due to Sonoran Crest’s ability to coordinate with Banner’s construction team and JHA. Major challenges for this project included the coordination of equipment with design specifications unique to the owners functional plan.

This technologically advanced 13,000 sf ambulatory surgery center consists of three operating rooms, medical procedures space, six pre-op bayes and 4 Post Anesthesia Care Units. The space also includes a lobby, receiving, nurse station, locker rooms storage and waiting room.